Sr.DEN/North/SBC sec SW-I Proposed Construction of pedestrian Subway at Km.
96/400-500 between Devarapalle - Hindupur Stations, by rolling/launching method.
Size 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division.
SW-II Proposed Construction of pedestrian Subway at Km. 96/700-800 between
Devarapalle - Hindupur Stations, by rolling/launching method. Size 1x5.00x2.65m
(Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-III Proposed
Construction of pedestrian Subway at Km.97/000-100 between Devarapalle -
Hindupur Stations, by rolling/launching method. Size 1x5.00x2.65m (Barrel length
=28.00m) under ADEN/Hindupur Sub-Division. SW-IV Proposed Construction of
pedestrian Subway at Km.161/200-400 between Makkajipalli - Nagasamudram
Stations, by rolling/launching method. Size 1x5.00x2.65m (Barrel length
=29.00m) under ADEN/Hindupur Sub-Division. SW-V Proposed Construction of
pedestrian Subway at Km.22/900-23/100 between Sri Sathya Sai Prashanthi
Nilayam - Basampalle Stations, by rolling and launching method.
Size1x5.00x3.15m (Barrel length =22.00m) under ADEN/Hindupur Sub-Division.
Maintenance period is 4 years
|
| Tender Detail : |
Sr.DEN/North/SBC sec: SW-I: Proposed Construction of pedestrian Subway at Km.
96/400-500 between Devarapalle - Hindupur Stations, by rolling/launching method.
Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division.
SW-II: Proposed Construction of pedestrian Subway at Km. 96/700-800 between
Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m
(Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-III: Proposed
Construction of pedestrian Subway at Km.97/000-100 between Devarapalle -
Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length
=28.00m) under ADEN/Hindupur Sub-Division. SW-IV: Proposed Construction of
pedestrian Subway at Km.161/200-400 between Makkajipalli - Nagasamudram
Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length
=29.00m) under ADEN/Hindupur Sub-Division. SW-V: Proposed Construction of
pedestrian Subway at Km.22/900-23/100 between Sri Sathya Sai Prashanthi
Nilayam - Basampalle Stations, by rolling and launching method.
Size:1x5.00x3.15m (Barrel length =22.00m) under ADEN/Hindupur Sub-Division.