Product Detail :
|
Annual Maintenance Estimate of Operation and Maintenance of Polavaram Irrigation Project Right Main Canal for Silt Removal Accumulated Earth due to heavy rains in catch drains on L/s and R/s from Km 0.000 to Km 68.911/71.500 for the the period 01.04.2025 to 31.03.2026
|